Erection of the 33 MWe trigeneration power plant at the New Terminal Area in the Airport of Madrid / Barajas (2004)
Energy audit of the District Heating of 364 MW at Tirgo Mures in Romania (2001)
Erection of a 5,4 MWe cogeneration power plant in Barcelona (1999).
Erection of the substantial modification of the 28 MWe combined cycle power plan...
Erection of a 1 MWe cogeneration power plant in Olot (2010)