Erection of the 33 MWe trigeneration power plant at the New Terminal Area in the Airport of Madrid / Barajas (2004)
Erection of a13,6 MWe trigeneration power plant in Tortosa (2007).
Erection of a 5,4 MWe cogeneration power plant in Barcelona (1999).
Erection of the substantial modification of the 12 MWe cogeneration power plant ...
Erection of a 1 MWe cogeneration power plant in Olot (2010)